The new RCH opened in 2011 and was inspired by the quality of light, textures and forms of its parklands setting.
It delivers a patient and family focused healing environment based on the latest evidence and research-based design principles.
Celmec’s Hospital Grade VAV units provide this progressive hospital with optimal air flow control to meet uncompromising climate, ventilation and bacterial management.
- Air Volume & Smoke Dampers
Manage air supply and the spread of smoke through air-conditioning and ventilation systems.
- Fire Dampers
Impede the spread of fire and combustible airborne materials through air-conditioning and ventilation systems.
- Variable Air Volume Terminal Unit
Precise localised temperature control by varying the rate of airflow.
Project classification